Trench Backfilling Quotes

Get Professional Services

Our Trusted Partners
Brannon LandWorx

Cost of Trench Backfilling in Blairsville

If you're planning a construction project in Blairsville, GA, understanding the cost of trench backfilling is essential for budgeting. Trench backfilling involves refilling excavated trenches with soil or other materials, ensuring stability and proper drainage. The overall cost can vary based on several factors.

Factors Affecting Cost

  • Soil Type: Different soil types require varying degrees of preparation and compaction.
  • Trench Depth and Width: Deeper and wider trenches require more materials and labor.
  • Material Choice: The cost differs if you use native soil, gravel, or other specialized backfill materials.
  • Labor Rates: Local labor rates in Blairsville, GA, can influence the overall cost.
  • Equipment Usage: The need for specialized equipment like compactors or excavators can add to the expenses.
  • Site Accessibility: Hard-to-reach sites may incur additional costs for transportation and logistics.

Average Costs for Common Tasks

Task Average Cost (Blairsville, GA)
Soil Backfilling $5 - $10 per cubic yard
Gravel Backfilling $15 - $30 per cubic yard
Labor Costs $50 - $75 per hour
Equipment Rental (Compactor) $100 - $150 per day
Excavation and Backfill $1,500 - $3,000 per project
Compaction Testing $200 - $400 per test

Understanding these factors and costs can help you better plan and budget for your trench backfilling project in Blairsville, GA.

Trench Backfilling